HOME  |  ABOUT  |  PRODUCTS  |  NEWS  |  RECRUITMENT  |  MESSAGE BOOK   CONTACT US | English
4 GANG RUI 535

"GANG RUI 535":LOA 190.5 m, BREADTH: 30.5 m DWT: 44062.5 TONS CLASS: CCS 
MAIN REPAIR ITEMS: STEEL RENEWAL ABOUT 1500 TONS, ENGINE ROOM PART AND STERN PART RECONDITION, STERN SHAFT NEW INSTALLED, RUDDER SYSTEM NEW INSTALLED, DECK CRANE REPAIR.

1 FIRST INSEPCTION IN DOCK BEFORE WE GOT THE ORDER

2 IN DRY DOCK OF MATOU SHIPYARD


3. LIFT THE STERN PART AROUND 4000 TONS WITH HIGH PRESSURE JET MACHINE


4 .STERN TUBE RECONDITIONNING


5 . STERN SHAFT NEW INSTALLATION



6.STERN TUBE NEW FABRICATION


7.RUDDER CARRIER NEW INSTALLATION



8.RUDDER BLADE NEW INSTALLATION


9.PROPELLER NEW INSTALLATION



10.MAIN ENGINE FOUNDATION RECONDITIONNING



11.STERN SHAFT FOUNDATION BLOCK INSTALLATION

12.DECK CRANE LOADING TEST WITH 30 TONS LOAD AFTER REPAIR



13. RAW MATERIAL PREPARATION


14.PANORAMA(BEFORE DOCK OUT)


15.READY FOR SAILING
© MATOU SHIPYARD All rights reserved. | Powered by: fuan.cn  备案号:闽ICP备08001504号-1